a complete presentation

This project was for a parking facility at a secure law enforcement location. 3D2 supplied 3 separate animation files as well as several still renderings explaining the logistics and design concepts behind the project. This is an abbreviated version of the original animation.

Client

The client for this project was Peter Brown Construction, in association with ARC3 Architects.

Schedule

The model of the existing structures and site was constructed by 3D2 in AutoCAD, while the garage model itself was a SketchUp model supplied by ARC3. The graphics were rendered in 3DS MAX, and the final graphics were completed in roughly 3 weeks.

Tools
  • AutoCAD
  • 3DS MAX
  • Adobe Photoshop
  • Adobe Premiere Pro